RB12, Rio de Janeiro
In May 2016, renovation works were completed on a Rio de Janeiro office block that aims to become a model for how the city's existing building stock can be upgraded and made more environmentally friendly.
The French-Brazilian studio Triptyque worked on revamping the 85 m-high office block RB12, as part of Porto Maravilha, the regeneration of the port area ahead of the summer's Olympic Games.
Rather than demolish the building, property developer Natekko commissioned Triptyque to design ways of making the building greener.
Part of their concept was to fit the 26-storey façade of the narrow building with innovative zigzagging glass panels and louvres, helping reduce sun exposure and allowing the glazing to 'play with light like a diamond'. The studio has called this a 'bioclimatic façade'.
The introduction of natural ventilation has improved the internal climate on the building's 21 office floors. All accessed via a spacious ground floor lobby, these floors each have a cranked plan that naturally divides the spaces into two sides.
Plant-covered balconies were also installed, irrigated by water from a new rainwater harvesting system which is also used for flushing toilets. Solar photovoltaic panels were added to much of the north-facing side wall, allowing the building to generate its own electricity and sell any energy not used back to the grid. Triptypque claims this is the first of its kind for a commercial building in Brazil.
"[It] embodies an innovative new concept of sustainable development based on energy production, thus following the global trend of green refurbishment, which consists in adapting and upgrading old buildings," they said.
Images courtesy of Leonardo Finotti.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Alexander Tower, Berlin.
- Allowable solutions.
- Arapiraca, Sao Paulo.
- Arches Boulogne, France.
- Code for Sustainable Homes.
- Community energy network.
- Conservation and storage facility for the Musée du Louvre.
- Glazing.
- Maggies Cancer Centre, Manchester.
- Make Buildings Better.
- Oasia Hotel Downtown, Singapore.
- Renewable energy.
- Renovation v refurbishment v retrofit.
- Retrofit.
- Skyfarm.
- Sustainability.
- Toronto Tree Tower.
Featured articles and news
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.






























